Cookies help us to provide our services. Using these services, you agree to the use of cookies on our part. Info

THE HONG KONG-ZHUHAI-MACAO BRIDGE WAS OPENED

October 25, 2018

Hong Kong, Macau and Zhuai have recently been connected by a series of structures that guarantee a direct link between the east and west banks of Pearl River.
In this project a key role is carried out by the longest bridge in the world (on sea), started in 2009 and opened a few days ago.
Trevi Hong Kong has participated in the stabilization of the artificial island, which is essential for the realization of the project, performing 450 columns of jet grouting (ø1.2÷3m, with depth up to 35 m), in only two and a half months to an average of 8 columns a day!
In order to achieve this work Trevi Hong Kong used 5 Soilmec High Pressure Pumps (4 7T-600J and 1 7T-505) and 6 Soilmec SM-20 hydraulic drilling rigs.

Read the technical reference HERE

  • WORLD DAY FOR SAFETY AND HEALTH AT WORK

    May 21, 2019
    TREVI GROUP has chosen to celebrate the 28th of April, the World Day for Safety and Health at Work
  • F4 - START OF CONSTRUCTION WORKS IN FRANKFURT

    December 18, 2018
    Start of drilling work
  • THE HONG KONG-ZHUHAI-MACAO BRIDGE WAS OPENED

    October 25, 2018
    The 55-kilometer long bridge links Hong Kong and Macao to the People's Republic of China